EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

SR 80 (Southern Blvd) Bridge Replacement Project

Home / Photos / July 2017 Construction Photos

July 2017 Construction Photos

A portion of Bingham Island is used for storage of equipment and materials.
Additional barges and cranes are mobilized north of the existing drawbridge.
A new barge is assembled at the Port of Palm Beach.
Light poles are removed from the Southern Boulevard Causeway.
A temporary wall is assembled east of the existing drawbridge.
Installing piles at Pier 21 of the temporary bridge.