November 2018 Construction Photos

The Intracoastal Waterway is clear as work is set to begin on installing drill shafts for the bascule bridge foundations. November 2018
Concrete seal slabs for the bascule piers are formed on barges in the Intracoastal Waterway. November 2018
Crews work on prepping the site for the western abutment of the bascule bridge. November 2018
A test drill shaft is removed after load testing is performed on it. November 2018
Work continues at the eastern abutment of the tide relief bridge. November 2018
Crews work on installing a wall at the east end of the bascule bridge. November 2018